Project Info

District Measure E Bond Program IT Upgrades — Millard Elementary School
5200 Valpey Park Dr.

Overview

  • FUSD Districtwide IT Upgrades Project consisted of 34 campuses.
  • Each project consisted of installation of all new data cabling and data racks for wired and Wireless internet Access Points as well as future VoIP clocks, bells, speakers, and telephones.
  • The total project cost for the 34 campuses was $50,152,643.
  • Each of these projects was delivered with a design-bid-build approach.

History/Rationale

In 2012, the District established the Long Range Facilities Plan (LRFP) that included a review of the facilities needs at each District site. A list of priority projects from the LRFP was developed to be included in the Measure E Bond.  Staff recommended moving forward with design and construction of these projects using the Design-Build delivery method in order to complete them within the required timeline.

Key Project Successes

Able to keep campus systems live with zero down time while installing a completely new parallel system.

Interesting or unique details

  • Projects were constructed during the Districtwide development of IT standards.
  • Walks were conducted at each site to allow input from site administrators, combined with District IT staff, to identify unique challenges at each campus and to offer and offer cost effective resolutions to avoid in-progress change orders.

 

Architect
LCA Architects

Program Manager
Vanir Construction Management

Construction Manager
CCM/STV, Inc.

Contractor
Vanden Bos Electric

Delivery Method
Design-Build

Square Footage
47,583

Date approved by Board
Sept. 30, 2015

Construction Duration
Nov. 2016 – Nov. 2017

Approved Project Budget
$1,275,576

RELATED BOARD ACTIONS:

 

Sept. 30, 2015— Authorize staff to enter into an agreement with LCA Architects for architectural services for Priority 4, Package 4 project-information technology (IT) upgrades at Millard Elementary School.

Amount: $160,543 (includes various schools) (Fund 21 Measure E Bond Program)

Apr. 13, 2016— Authorize staff to enter into an agreement with AMS.NET for the purchase and installation of technology hardware devices needed for the Measure E IT upgrade projects.

Amount: $7,000,000 (includes 33 schools) (Fund 21 Measure E Bond Program)

June 29, 2016— Authorize staff to amend the agreement with LCA Architects for the IT upgrade project at Millard Elementary School.

Amount: $66,911 (includes various schools) (Fund 21 Measure E Bond Program)

Sept. 28, 2016— Authorize the budget reallocation for IT projects at 30 sites.

Amount: $17,787,934 (includes 30 sites) (Fund 21 Measure E Bond Program).

Sept. 28, 2016— Authorize staff to amend the existing agreement with CCM/STV for Construction Management services for Measure E Bond projects, including the Millard Elementary School and Robertson High School IT upgrade projects.

Amount: $144,554 (for Millard and Robertson sites) (Fund 21 Measure E Bond Program).

Oct.26, 2016— Authorize staff to enter into an agreement with Smith Emery for construction phase materials testing and special inspection services for the Priority 4, Package 4 IT upgrade project at Millard Elementary School.

Amount: $41,495 (includes various schools) (Fund 21 Measure E Bond Program).

Oct. 26, 2016— Authorize staff to enter into an agreement with Terraphase Engineering, Inc. for construction phase environmental consulting services for the Priority 4, Package 4 IT upgrade project at Millard Elementary School.

Amount: $12,958 (includes various schools) (Fund 21 Measure E Bond Program).

Oct. 26, 2016— Authorize staff to enter into an agreement with Jerome Zalinski for construction phase project inspector services for the Priority 4, Package 4 IT upgrade project at Millard Elementary School.

Amount: $65,340 (includes various schools) (Fund 21 Measure E Bond Program).

Aug. 23, 2017— Authorize staff to amend the agreement with Jerome Zalinski for the IT upgrade project at Millard Elementary School

Amount: $14,700 (includes various schools) (Fund 21 Measure E Bond Program).

Sept. 13, 2017— Authorize staff to amend the agreement with Terraphase Engineering, Inc. for the IT upgrade project at Millard Elementary School.

Amount: $28 (Fund 21 Measure E Bond Program).

Oct. 25, 2017— Approve final change orders with Vanden Bos Electric, Inc. for the construction of the Priority 4, Package 4 IT upgrade project at Millard Elementary School.

Amount: $-74,396 (includes various schools) (Fund 21 Measure E Bond Program).

Oct. 25, 2017— Authorize staff to file a notice of completion with Vanden Bos Electric for the IT upgrade project at Millard Elementary School.