Project: Demolition and replacement of existing asbestos containing flooring on campus.

Overview

  • 7,600 square feet of new vinyl composition tile (VCT) installed within the Wing 700 and Wing 600 corridors and gathering areas in addition to 700 square feet installed within the Wing 400 administrative entry.
  •  4,000 square feet of new carpet tile installed within the Wing 200 teacher lounge area in addition to 300 square feet installed within the Wing 400 administrative offices
  • Asbestos containing flooring on campus demolished, abated, and replaced.

History/Rationale

  • To achieve parity with the other school sites in the District whom already received abatement/replacement of their existing asbestos containing flooring.

Key Project Successes

The project was successfully completed on schedule and ready for occupancy by the end of the 2018 Summer. 

Interesting or unique details

  • To abate the flooring underneath, the administrative office’s existing cubicles were required to be temporarily removed and replaced.

Architect
LCA Architects

Program Manager
Vanir Construction Management

Construction Manager
Roebellen

Contractor
Rodan Builders

Industrial Hygienist
HazMat Doc

Delivery Method
Design-Bid-Build

Square Footage
12,600

Date approved by Board
May 9, 2018

Construction Duration
June 2018 – August 2018

Approved Project Budget
$435,472

Related Board Actions:

July 14, 2015— Authorize staff to enter into agreement for architectural services for RFP 129, Package 1 for the American High School HVAC upgrade, IT upgrade, flooring and exterior lighting project.

Amount: $359,250 (Fund 21 Measure E Bond Program).

June 15, 2016 — Authorize staff to amend the agreement with LCA Architects for the design of American High School HVAC Upgrade, IT Upgrade, Flooring, and Exterior Lighting Project.

Amount: $53,060 (Fund 21 Measure E Bond Program).

Feb 22, 2017 — Approve the revised Measure E Bond implementation plan, budget and cash flow (including the original $359,250 for flooring upgrades).

July 26, 2017 — Receive an update on the American High School Modernization Project.

March 28, 2018 — Authorize staff to amend the agreement with LCA Architects for the modernization projects - phase 1 at American High School. (Phase 1 includes HVAC, Boiler, Chiller, IT Upgrade, Roofing, Flooring, and Exterior Lighting.)

Amount: $811,769 (Fund 21 Measure E Bond Program).

May 9, 2018 — Authorize staff to enter into an agreement with Rodan Builders, Inc. ($219,390) for construction services and HazMat Doc ($17,336) for industrial hygienist consulting services for the modernization project at American High School for flooring.

Amount: $236,726 (Fund 21 Measure E Bond Program).

Oct 24, 2018— Authorize staff to file a notice of completion (NOC) with Rodan Builders, Inc. for the modernization project at American High School for flooring.